EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha



Custom Search

ITS » Undergraduate Theses » Teknik Industri
Posted by eny at 27/01/2009 16:49:33  •  3627 Views


WASTES REDUCTION PADA PROSES PRODUKSI KOMPONEN LAMPU (STUDI KASUS DI PT PHILIPS INDONESIA)

WASTES REDUCTION LAMP COMPONENTS PRODUCTION PROCESS (APLICATION IN PT PHILIPS INDONESIA)

Author :
PRATAMA, DIKTA 




ABSTRAK

Pada setiap kegiatan produksi terdapat aktifitas Value Adding (VA) dan Non value Adding (NVA). Dalam Toyota Production Sistem aktifitas yang Non value Adding diupayakan dihilangkan atau diminimumkan. Lamp Components Factory PT Philips Indonesia yang memproduksi komponen lampu, Salah satunya adalah exhaust tube yang berfungsi untuk menyangga elektroda, juga berupaya untuk menghilangkan Non value Adding. yaitu defect dan banyaknya produk berkualitas bagus namun terbuang. Jumlah Produk defect ini mencapai 2.1 % dari seluruh total produksi. Sedangkan untuk produk yang terbuang mencapai 3,8% dari seluruh total produksi. Pada penelitian ini akan diidentifikasi penyebab defect dan produk yang terbuang. Setelah diketahui penyebabnya maka akan dilakukan alternatif perbaikan sehingga dapat menguranggi defect dan produk yang terbuang. Hasil dari penelitian ini adalah alternatif perbaikan berupa penggantian pemberat / perata exhaust tube pada belt conveyor, disamping itu ditetapkan standart pelaksanaan adjustment mesin cutting.


ABSTRACT

Any production activity, there are 2 types of actifity named Value Adding (VA) and Non value Addin (NVA) activity. in Toyota Production System, Non value Adding (NVA) must be minimize. Lamp components factory PT Philips Indonesia produce lamp components. One of this product is the exhaust tube also has to minimize Non value Adding (NVA), There are defect and alot of goods quality products that have been scraped. In existing condition total product defec is 2,1% out of total production. While scrap production is 3,8% out of total production. This cause of defect and scraped production have been found. After have found cause of defect and production scrap. Researcher gives alternatives improvment to minimize defect and scraped production. Results this research are the improvment production process, there are tool conveyor replacement and adjustment of cutting machine using the company standart.

KeywordsProses produksi ; Komponen lampu ; Valeu adding activity, Non Valeu adding activity
 
Subject:  Production management
Contributor
  1. Ir. MOKH. SUEF, MSc. (eng).
Date Create: 27/01/2009
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-Undergraduate-3100008032820
Collection ID: 3100008032820
Call Number: RSI 658.5 Pra w


Source
Undergraduate Theses, Industrial Engineering, RSI 658.5 Pra w, 2008

Coverage
ITS Community Only

Rights
Copyright @2008 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library.


Publication URL :
http://digilib.its.ac.id/wastes-reduction-pada-proses-produksi-komponen-lampu-studi-kasus-di-pt-philips-indonesia-3490.html




[ Free Download - Free for All ]

...No Files...

 Similar Document...



 Related Document...

     No related subject found !




HELP US !
You can help us to define the exact keyword for this document by clicking the link below :

Komponen , Komponen lampu , Non , Non Valeu adding activity , Proses , Proses produksi , Valeu , Valeu adding activity , activity , adding , lampu , produksi




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




99748002


Visitors Today : 1793
Total Visitor : 2919389

Hits Today : 65967
Total Hits : 99748002

Visitors Online: 57


Calculated since
16 May 2012

You are connected from 54.198.208.159
using CCBot/2.0 (http://commoncrawl.org/faq/)


ITS Digital Repository Feeds



Copyright © ITS Library 2006 - 2016 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan