EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Master Theses » Manajemen Rekayasa Transportasi S2
Posted by ida at 22/12/2006 13:49:39  •  27072 Views


PENENTUAN JUMLAH ARMADA ANGKUTAN KOTA DL KABUPATEN BARITO SELATAN BUNTOK

DETERMINATION SUM UP ARMADA OF TRANSPORTATION IN TOWN OF SOUTH BARITO BUNTOK

Author :
ARDIANSYAH  




ABSTRAK

Kota Buntok sebagai ibukota Kabupaten Barito Selatan Propinsi Kalimantan Tengah berkembang sangat pesat yang berada pada tepian sungai Barito dengan jumlah penduduk tahun 2003 sebanyak 13.106 jiwa dan tingkat peitumbuhan penduduk 148. Penelitian ini bertujuan menentukan permintaan penumpang angkutan kota pada ruas jalan yang dilayani pada masa sekarang dan proyeksi masa mendatang tahun 2008 mendapatkan jumlah pergerakan angkutan kota pada masa sekarang dan proyeksi masa mendatang tahun 2008 dan mendapatkan jumlah armada angkutan umum pada masa sekarang dan proyeksi masa mendatang tahun 2008. Pelaksanaan penelitian dilakukan di kota Buntok pada rute Terminal Induk Buntok - Terminal Uria Mapas. Permintaan penumpang yang dirumuskan dengan Matriks Asal Tujuan MAT dilakukan dengan menggunakan metode survey wawancara kepada calon penumpang yang berada pada sepanjang rute tersebut dan juga diproyeksi dengan menggunakan metode Detroit untuk mendapat permintaan penumpang proyeksi masa mendatang tahun 2008. Dari hasil pengolahan data didapatkan jumlah armada untuk masa sekarang tahun 2003 sebanyak 8 buahhari 65 rithari dengan Load Factor 80 sedangkan proyeksi ke depan tahun 2008 jumlah armada sebanyak 8 buahhari 70 rit dengan Load Factor 86.


ABSTRACT

The town of Buntok as capital of Kabupaten South Barito Center Kalimantan Province grows very fast. The town located by the river of Barito has a population of 13.106 with a population growth of 148. This research aim to determine the public transport demand frequency and the fleet size for the year 2003. A prediction for year 2008 of these aspects was also made. The research was done in Buntok for a route between Main Terminal to Uria Mapas Terminal in the center of Buntok. Present Passenger Demand expressed in the form of Original Destination Matrix OD Matrix has been gotten from Passenger Interview Survey. A future prediction for the year 2008 has been calculated using Detroit Model based on the existing Origin Destination Matrix. Data collection indicated that at present the fleet size is 8 vehicle operated in 65 tripsday with an average load factor of 080. The future prediction gave the following fleet size needed is of 8 vehicle operated in 70 tripsday with predicted load factor of 086.



KeywordsJumlah armada; MAT; Load Factor
 
Subject:  Pengangkutan Kota
Contributor
  1. Ir. Achmad Faiz Hadi,MS.
    IR. Norman Ruslan, MT.
Date Create: 22/12/2006
Type: Text
Format: pdf ; 46 pages
Language: Indonesian
Identifier: ITS-Master-3100003018397
Collection ID: 3100004019953
Call Number: 388 Ard p


Source
Theses Civil Engineering RTS 388 Ard p, 2005

Coverage
ITS Community

Rights
Copyright @2005 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write




[ Download - Summary ]

ITS-Master-3100004019953-120.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.87.119.171
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2016 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan