 |
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya
Kampus ITS Sukolilo - Surabaya 60111
|
|
Phone |
: |
031-5921733 , 5923623 |
|
Fax |
: |
031-5937774 |
|
E-mail |
: |
libits@its.ac.id |
|
Website |
: |
http://library.its.ac.id
|
Support (Customer Service) :
|
|
timit_perpus@its.ac.id |
|
|
Welcome..guys!
|
Have a problem with your access?
Please, contact our technical support below:
|
LIVE SUPPORT
 Taufik Rachmanu  Dewi Eka Agustina  Ansi Aflacha Putri  Tondo Indra Nyata  Aprillia Tri Wulansari
|
! ATTENTION !
To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently
Still Confuse?
Please read our User Guide
|
|
ITS » Undergraduate Theses » Teknik Sipil Posted by dewi007 at 07/08/2009 11:31:47 • 3374 Views
ALTERNATIF DESAIN DINDING PENAHAN
LPA BENOWOALTERNATIF STUDY OF RETAINING WALL
DESIGN LPA BENOWOCreated by :
Pradipta, Aprit Aditya ; Gustirangga, Agung Pramudita ( 3104100057 )
| Subject: | Dinding
| | Alt. Subject : | Retaining walls
| | Keyword: | Dinding penahan geotextile wall alternatif desain
|
Description:
Saat ini salah satu permasalahan terbesar bagi kota
Surabaya adalah sampah yang terus bertambah seiring dengan
bertambahnya penduduk. Salah satu solusi untuk mengatasi
masalah ini adalah pengembangan Lahan Pembuangan Akhir
(LPA) yang berlokasi di Benowo. Pengembangan LPA ini diikuti
dengan pembangunan dinding penahan sebagai struktur yang
akan menahan timbunan sampah. Tinggi dinding penahan
direncanakan dibangun setinggi 5 meter diatas tanah lunak
dengan kedalaman tanah keras -20 m. Dari latar belakang tersebut
timbul sebuah pemikiran untuk melakukan studi alternatif tentang
desain struktur dinding penahan yang memungkinkan untuk
dibangun dan murah.
Untuk mendapatkan desain tersebut awalnya dilakukan
studi literatur mengenai dinding penahan. Kemudian dipilih
beberapa desain untuk direncanakan, baru setelah itu
merencanakan dimensi dari dinding penahan tersebut. Setelah
didapatkan dimensi dari struktur dan memenuhi stabilitas yang
disyaratkan maka diadakan analisa biaya. Khusus untuk dinding
penahan beton bertulang, apabila perhitungan stabilitasnya tidak memenuhi maka digunakan tiang pancang karena dalam hal ini
tanah dasarnya adalah tanah lunak. Sedang untuk geotexile wall
apabila stabilitasnya tidak memenuhi maka direncanakan
perbaikan tanah dasar, namun apabila perbaikan tanah dasar
dipertimbangkan tidak mungkin dilaksanakan maka tidak akan
dilakukan analisa biaya.
Dari perhitungan yang telah dilakukan, dipilih dinding
penahan tipe kantilever bertangga modifikasi soldier pile dengan
batter pile. Tipe tersebut dipilih karena total biaya konstruksinya
yang murah yaitu 6.692.635.450 rupiah dengan panjang dinding
145 m.
Alt. Description
Nowadays, one of the problems in Surabaya is rubbish with
each passing day worsen. It can be solved by building a sanitary
landfill in Benowo. Retaining wall is built to complete this
sanitary landfill as the structure to retain the surcharge of soil.
The height of the wall is about 5 meters from the surface with
depth of rock materials is about 20 meters. So, it is very important
to do the alternative study of retaining wall design to get the most
effective and the cheapest design.
There are several steps to get the design. First, we studied
the literature about the retaining wall. Then, we choose some
design to be built, and planed its dimension. After the dimension
is in compliance with its stability control, we analyzed its cost.
There are three designs of retaining wall, such as counterfort
concrete retaining wall, concrete retaining wall with cantilever
arranged in steps, and geotextile wall. For bearing capacity of
both of concrete retaining wall is ineligible, use pile to recover it.
And for bearing capacity of geotextile wall is ineligible, do some
soil improvement of sub grade. The conclusion of design calculation is concrete retaining
wall with cantilever arranged in steps modified with soldier pile
and batter pile is chosen because the construction cost is the
cheapest, 6.692.635.450 rupiahs, with the length of wall is about
145 meters.
| Contributor | : |
- Ir. MOESDARJONO SOETOJO, MSc
MUSTA’IN ARIF, ST. MT
| | Date Create | : | 07/08/2009 | | Type | : | Text | | Format | : | pdf. | | Language | : | Indonesian | | Identifier | : | ITS-Undergraduate-3100009035542 | | Collection ID | : | 3100009035542 | | Call Number | : | RSS 690.12 Pra a |
Source : Undergraduate theses of Civil Engineering, RSS 690.12 Pra a, 2099
Coverage : ITS Community Only
Rights : Copyright @2009 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library
Publication URL : http://digilib.its.ac.id/alternatif-desain-dinding-penahanlpa-benowo-5097.html
[ Free Download - Free for All ]
...No Files...
[ FullText Content - Please, register first ]
1. ITS-Undergraduate-5097-3104 100 057-judul.pdf - 78 KB 2. ITS-Undergraduate-5097-3104 100 057-bab1.pdf - 418 KB 3. ITS-Undergraduate-5097-3104 100 057-bab2-1.pdf - 129 KB 4. ITS-Undergraduate-5097-3104 100 057-bab2-2.pdf - 1065 KB 5. ITS-Undergraduate-5097-3104 100 057-bab2-3.pdf - 1345 KB 6. ITS-Undergraduate-5097-3104 100 057-bab2-4.pdf - 118 KB 7. ITS-Undergraduate-5097-3104 100 057-bab3.pdf - 147 KB 8. ITS-Undergraduate-5097-3104 100 057-bab4.pdf - 294 KB 9. ITS-Undergraduate-5097-3104 100 057-bab5.pdf - 1240 KB 10. ITS-Undergraduate-5097-3104 100 057-bab7.pdf - 151 KB 11. ITS-Undergraduate-5097-3104 100 057-kesimpulan.pdf - 51 KB
Give your Comment here...
10 Similar Document...
10 Related Document...
No related subject found !
|
POLLINGBagaimana pendapat Anda tentang layanan repository kami ?

      
Visitors Today : 415
Total Visitor : 1527431
Hits Today : 7577
Total Hits : 25884435
Visitors Online: 33
Calculated since 16 May 2012
You are connected from 184.73.7.143 using CCBot/2.0
|