 |
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya
Kampus ITS Sukolilo - Surabaya 60111
|
Phone |
: |
031-5921733 , 5923623 |
Fax |
: |
031-5937774 |
E-mail |
: |
libits@its.ac.id |
Website |
: |
http://library.its.ac.id
|
Support (Customer Service) :
|
timit_perpus@its.ac.id |
|
|
Welcome..guys!
|
Have a problem with your access?
Please, contact our technical support below:
|
LIVE SUPPORT
 Davi Wahyuni  Tondo Indra Nyata  Anis Wulandari  Ansi Aflacha
|
|
List of TEKNIK SIPIL - D3 Collections
Total of Records : 459 collections
Published by ITS at 03/12/2015 15:06:11 KAJIAN SISTEM DRAINASE JALAN MAYJEND SUNGKONO SURABAYA SETELAH DIBANGUN SUDETAN MAHARDHIKA, RIZKY DWIYAN - TEKNIK SIPIL - D3 - [ 1090 views]
Published by ITS at 03/12/2015 14:17:10 PERHITUNGAN ANGGARAN BIAYA DAN WAKTU
PADA STRUKTUR BANGUNAN SHOWROOM DAN
BENGKEL PT. SRIKANDI DIAMOND MOTORS
SERPONG TANGERANG MULYO, SAYUTI - TEKNIK SIPIL - D3 - [ 1081 views]
Published by ITS at 03/12/2015 13:40:41 PERHITUNGAN ANGGARAN BIAYA DAN WAKTU
PADA STRUKTUR BANGUNAN SHOWROOM DAN
BENGKEL PT. SRIKANDI DIAMOND MOTORS
SERPONG TANGERANG MULYO, SAYUTI - TEKNIK SIPIL - D3 - [ 1149 views]
Published by ITS at 03/12/2015 10:46:15 METODE PELAKSANAAN GROUNDSILL REGOYO
DESA GONDORUSO KECAMATAN PASIRIAN
KABUPATEN LUMAJANG JAWA TIMUR SARI, ANY PURWITO - TEKNIK SIPIL - D3 - [ 1373 views]
Published by ITS at 03/12/2015 10:32:02 METODE PELAKSANAAN GROUNDSILL REGOYO
DESA GONDORUSO KECAMATAN PASIRIAN
KABUPATEN LUMAJANG JAWA TIMUR SARI, ANY PURWITO - TEKNIK SIPIL - D3 - [ 1817 views]
Published by ITS at 03/12/2015 09:50:09 PERHITUNGAN STRUKTUR GEDUNG RUSUNAWA TAMBAK SAWAH SIDOARJO DENGAN METODE SISTEM RANGKA PEMIKUL MOMEN MENENGAH (SRPMM) SEPTIAWAN, AHMAD PUGUH - TEKNIK SIPIL - D3 - [ 885 views]
Published by ITS at 03/12/2015 09:28:07 PERHITUNGAN STRUKTUR GEDUNG RUSUNAWA TAMBAK SAWAH SIDOARJO DENGAN METODE SISTEM RANGKA PEMIKUL MOMEN MENENGAH (SRPMM) SEPTIAWAN, AHMAD PUGUH - TEKNIK SIPIL - D3 - [ 964 views]
Published by ITS at 27/11/2015 13:51:46 PLANNING WATER DISTRIBUTION SYSTEM IN THE VILLAGE JAPANAN,GEMBRONG PONDS,DISCTRIC MOJOWARNO, JOMBANG REGENCY EAST JAVA PUTRA, RIZAL SYAH - TEKNIK SIPIL - D3 - [ 994 views]
Published by ITS at 27/11/2015 13:50:47 PERENCANAAN SISTEM DISTRIBUSI AIR BERSIH DARI EMBUNG GEMBRONG KECAMATAN MOJOWARNO, DESA JAPANAN, KABUPATEN JOMBANG JAWA TIMUR PUTRA, RIZAL SYAH - TEKNIK SIPIL - D3 - [ 829 views]
Published by ITS at 25/11/2015 10:04:28 ELECTRICAL ENGINEERING LABORATORY-ITS STRUCTURE DESIGN WITH EXTERNAL PRESTRESSED CONCRETE USING F.R.P HASAN, BAGUS DWI KUSUMA - TEKNIK SIPIL - D3 - [ 1137 views]
Published by ITS at 25/11/2015 09:36:39 STRUCTURAL DESIGN OF PAMEKASAN DISTRICT GOVERNMENT OFFICE BUILDING WITH STEEL FRAME STRUCTURE USING LOAD AND RESISTANCE FACTOR DESIGN METHOD SUPRAPTO, AGUNG HADI - TEKNIK SIPIL - D3 - [ 786 views]
Published by ITS at 25/11/2015 09:23:38 PERENCANAAN STRUKTUR GEDUNG KANTOR
PEMERINTAH DAERAH KABUPATEN PAMEKASAN
DENGAN STRUKTUR BAJA METODE LOAD RESISTANCE AND FACTOR DESIGN SUPRAPTO, AGUNG HADI - TEKNIK SIPIL - D3 - [ 1643 views]
Published by ITS at 25/11/2015 09:02:59 ESTIMATED TIME AND COST OF DEVELOPMENT PROJECTS FLY OVER PORONG - GEMPOL PACKET 3A STA 40 + 925 - STA 42+650 ISMOYO, YUGO - TEKNIK SIPIL - D3 - [ 783 views]
Published by ITS at 17/11/2015 14:03:59 PERENCANAAN STRUKTUR GEDUNG PUSAT KEGIATAN MAHASISWA POLITEKNIK NEGERI MALANG DENGAN SISTEM RANGKA PEMIKUL MOMEN MENENGAH (SRPMM) CIPTADI, TRIA - TEKNIK SIPIL - D3 - [ 1105 views]
Published by ITS at 17/11/2015 14:03:53 PERENCANAAN STRUKTUR GEDUNG PUSAT KEGIATAN MAHASISWA POLITEKNIK NEGERI MALANG DENGAN SISTEM RANGKA PEMIKUL MOMEN MENENGAH (SRPMM) CIPTADI, TRIA - TEKNIK SIPIL - D3 - [ 1180 views]
Published by ITS at 05/11/2015 10:53:06 PERENCANAAN STRUKTUR GEDUNG GRAHA ATMAJA SURABAYA DENGAN STRUKTUR BAJA METODE LOAD RESISTANCE AND FACTORED DESIGN IRAWAN, ANDI CANDRA - TEKNIK SIPIL - D3 - [ 1256 views]
Published by ITS at 05/11/2015 10:52:57 PERENCANAAN STRUKTUR GEDUNG GRAHA ATMAJA SURABAYA DENGAN STRUKTUR BAJA METODE LOAD RESISTANCE AND FACTORED DESIGN IRAWAN, ANDI CANDRA - TEKNIK SIPIL - D3 - [ 1234 views]
Published by ITS at 05/11/2015 10:43:51 PERBANDINGAN WAKTU DAN BIAYA ANTARA PLAT LANTAI KONVENSIONAL DENGAN PANEL LANTAI CITICON PADA PROYEK PEMBANGUNAN GEDUNG A SDN SIDOTOPO WETAN IV SURABAYA WIJAYA, ANGGA SUKMA - TEKNIK SIPIL - D3 - [ 1276 views]
Published by ITS at 05/11/2015 10:43:41 PERBANDINGAN WAKTU DAN BIAYA ANTARA PLAT LANTAI KONVENSIONAL DENGAN PANEL LANTAI CITICON PADA PROYEK PEMBANGUNAN GEDUNG A SDN SIDOTOPO WETAN IV SURABAYA WIJAYA, ANGGA SUKMA - TEKNIK SIPIL - D3 - [ 1052 views]
Published by ITS at 05/11/2015 10:35:44 PERENCANAAN PELAKSANAAN PEMBANGUNAN STRUKTUR GEDUNG KLINIK BEDAH ORTHOPEDI CITRALAND SURABAYA PUTRI, TANNIA KURNIA - TEKNIK SIPIL - D3 - [ 1118 views]
|
Rec : 21-40 of 459
|
|
Latest Posting for Collections...
|
PERENCANAAN PENINGKATAN JALAN LEGUNDI - PERTIGAAN BUNDER (LINK. 169) KM LEGUNDI 5+700 - 8+700 KABUPATEN GRESIK PROPINSI JAWA TIMUR MENGGUNAKAN PERKERASAN LENTUR TEKNIK SIPIL - D3 • 2386 views
RENCANA KONTIJENSI UNTUK TANAH LONGSOR DI DESA KALIKUNING PACITAN JAWA TIMUR TEKNIK SIPIL - D3 • 2358 views
SIMULASI PENGARUH KEMIRINGAN ATAP RUMAH TERHADAP HUJAN PASIR ERUPSI GUNUNG API TEKNIK SIPIL - D3 • 962 views
PERANCANGAN STRUKTUR BENDUNGAN BETON WADUK TITAB, KABUPATEN BULELENG, PROVINSI BALI TEKNIK SIPIL - D3 • 2245 views
PERANCANGAN STRUKTUR BENDUNGAN BETON WADUK TITAB, KABUPATEN BULELENG, PROVINSI BALI TEKNIK SIPIL - D3 • 1069 views
|
|
! ATTENTION !
To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently
|
POLLINGBagaimana pendapat Anda tentang layanan repository kami ?
You are connected from 10.199.6.2 using CCBot/2.0 (https://commoncrawl.org/faq/)
|