EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




 List of S1 Teknik Sipil - Lintas Jalur Collections


Total of Records : 283 collections


Published by ITS at 17/05/2016 15:11:23
THE DRAINAGE SYSTEM EFFECTS OF GRAHA NATURA RESIDENCE BUILDS TO LONTAR`S CHANNEL, KECAMATAN SAMBIKEREP, SURABAYA
SABRANG, RANGGA ADI - S1 Teknik Sipil - Lintas Jalur - [ 548 views]

Published by at 17/05/2016 15:10:44
DAMPAK SISTEM DRAINASE PEMBANGUNAN PERUMAHAN GRAHA NATURA TERHADAP SALURAN LONTAR, KECAMATAN SAMBIKEREP, SURABAYA
SABRANG, RANGGA ADI - S1 Teknik Sipil - Lintas Jalur - [ 580 views]

Published by ITS at 16/05/2016 14:11:00
REDESIGN LEMAH IRENG (UNGARAN BAWEN ) BRIDGE, SEMARANG RESIDENCE WITH CABLE STAYED SINGLE PLANE SYSTEM
NUGRAHANTO, FRANSISKO MURDIONO - S1 Teknik Sipil - Lintas Jalur - [ 1133 views]

Published by at 16/05/2016 14:09:25
PERENCANAAN ULANG JEMBATAN LEMAH IRENG ( UNGARAN – BAWEN ), KABUPATEN SEMARANG DENGAN SISTEM CABLE STAYED SINGLE PLANE
NUGRAHANTO, FRANSISKO MURDIONO - S1 Teknik Sipil - Lintas Jalur - [ 605 views]

Published by ITS at 10/05/2016 15:43:53
TRANSPORT PLANNING BUS CORRIDOR SURABAYA - SIDOARJO (THROUGH ROAD Ahmad Yani)
IDETYAWAN, DANANG - S1 Teknik Sipil - Lintas Jalur - [ 649 views]

Published by ITS at 10/03/2016 09:20:25
ANALISA HIGHEST AND BEST USE PADA LAHAN KOSONG DI JEMUR GAYUNGAN II SURABAYA
FARADIANY, FINDA VIRGITTA - S1 Teknik Sipil - Lintas Jalur - [ 647 views]

Published by ITS at 10/03/2016 09:20:15
HIGHEST AND BEST USE ANALYSIS OF VACANT LAND IN JEMUR GAYUNGAN II SURABAYA
FARADIANY, FINDA VIRGITTA - S1 Teknik Sipil - Lintas Jalur - [ 625 views]

Published by ITS at 25/02/2016 09:10:26
ANALISA DAN PENGUKURAN POTENSI RISIKO KECELAKAAN KERJA DENGAN MENGGUNAKAN METODE APMM (ACCIDENT POTENTIAL MEASUREMENT METHOD) PADA PROYEK PEMBANGUNAN DORMITORY 5 LANTAI AKADEMI TEKNIK KESELAMATAN DAN PENERBANGAN SURABAYA
JUNAEDI, TAUFIQ - S1 Teknik Sipil - Lintas Jalur - [ 491 views]

Published by ITS at 25/02/2016 09:10:24
ANALISA DAN PENGUKURAN POTENSI RISIKO KECELAKAAN KERJA DENGAN MENGGUNAKAN METODE APMM (ACCIDENT POTENTIAL MEASUREMENT METHOD) PADA PROYEK PEMBANGUNAN DORMITORY 5 LANTAI AKADEMI TEKNIK KESELAMATAN DAN PENERBANGAN SURABAYA
JUNAEDI, TAUFIQ - S1 Teknik Sipil - Lintas Jalur - [ 615 views]

Published by ITS at 12/02/2016 14:03:37
MODIFICATION OF THE STRUCTURE OF BRIDGE BOX GIRDER SEGMENTAL WITH PRESTRESSED CONCRETE CONSTRUCTION SYSTEM CASE STUDY OF A TOLL BRIDGE Ir. SOEKARNO-MANADO NORTH SULAWESI
WIBOWO, HAFIZHUDDIN SATRIYO - S1 Teknik Sipil - Lintas Jalur - [ 933 views]

Published by ITS at 21/10/2015 08:26:06
STUDI PENGARUH DIAMETER DAN PANJANG TIANG PANCANG TERHADAP AMPLITUDO GETARAN PADA PERENCANAAN PONDASI ALTERNATIF TURBIN GAS
MUHAMMAD, HASBY SIDDIQ - S1 Teknik Sipil - Lintas Jalur - [ 1128 views]

Published by ITS at 21/10/2015 08:25:56
STUDI PENGARUH DIAMETER DAN PANJANG TIANG PANCANG TERHADAP AMPLITUDO GETARAN PADA PERENCANAAN PONDASI ALTERNATIF TURBIN GAS
MUHAMMAD, HASBY SIDDIQ - S1 Teknik Sipil - Lintas Jalur - [ 1116 views]

Published by ITS at 21/10/2015 08:13:08
PERENCANAAN ANGKUTAN BUS KORIDOR TERMINAL TAMBAK OSOWILANGUN-PERAKKENJERAN SURABAYA
ADYAKSA, SATRIA - S1 Teknik Sipil - Lintas Jalur - [ 732 views]

Published by ITS at 21/10/2015 08:12:59
PERENCANAAN ANGKUTAN BUS KORIDOR TERMINAL TAMBAK OSOWILANGUN-PERAKKENJERAN SURABAYA
ADYAKSA, SATRIA - S1 Teknik Sipil - Lintas Jalur - [ 627 views]

Published by ITS at 21/10/2015 08:05:54
PERENCANAAN PENGEMBANGAN ANGKUTAN BUS KORIDOR TERMINAL TAMBAK OSOWILANGON–KECAMATAN PACIRAN
HADIYANTO, FAJAR BAGUS - S1 Teknik Sipil - Lintas Jalur - [ 807 views]

Published by ITS at 21/10/2015 08:05:46
PERENCANAAN PENGEMBANGAN ANGKUTAN BUS KORIDOR TERMINAL TAMBAK OSOWILANGON–KECAMATAN PACIRAN
HADIYANTO, FAJAR BAGUS - S1 Teknik Sipil - Lintas Jalur - [ 548 views]

Published by ITS at 18/08/2015 17:28:33
IDENTIFIKASI DAN ANALISA RISIKO KECELAKAAN KERJA DENGAN METODE FMEA (FAILURE MODE AND EFFECT ANALYSIS) DAN FTA (FAULT TREE ANALYSIS) DI PROYEK JALAN TOL SURABAYA – MOJOKERTO
SINAGA, YESSI YOLANDA - S1 Teknik Sipil - Lintas Jalur - [ 1212 views]

Published by ITS at 18/08/2015 17:28:30
IDENTIFIKASI DAN ANALISA RISIKO KECELAKAAN KERJA DENGAN METODE FMEA (FAILURE MODE AND EFFECT ANALYSIS) DAN FTA (FAULT TREE ANALYSIS) DI PROYEK JALAN TOL SURABAYA – MOJOKERTO
SINAGA, YESSI YOLANDA - S1 Teknik Sipil - Lintas Jalur - [ 1144 views]

Published by ITS at 18/08/2015 17:17:41
MODIFIKASI PERENCANAAN GEDUNG FMIPA UNIVERSITAS NEGERI MAKASAR MENGGUNAKAN STRUKTUR BAJA DENGAN SISTEM RANGKA BRESING KONSENTRIS KHUSUS
ISTIONO, HERI - S1 Teknik Sipil - Lintas Jalur - [ 555 views]

Published by ITS at 18/08/2015 17:17:36
MODIFIKASI PERENCANAAN GEDUNG FMIPA UNIVERSITAS NEGERI MAKASAR MENGGUNAKAN STRUKTUR BAJA DENGAN SISTEM RANGKA BRESING KONSENTRIS KHUSUS
ISTIONO, HERI - S1 Teknik Sipil - Lintas Jalur - [ 469 views]

Rec : 1-20 of 283

 
 Latest Posting for Collections...

THE DRAINAGE SYSTEM EFFECTS OF GRAHA NATURA RESIDENCE BUILDS TO LONTAR`S CHANNEL, KECAMATAN SAMBIKEREP, SURABAYA
S1 Teknik Sipil - Lintas Jalur  •  548 views


DAMPAK SISTEM DRAINASE PEMBANGUNAN PERUMAHAN GRAHA NATURA TERHADAP SALURAN LONTAR, KECAMATAN SAMBIKEREP, SURABAYA
S1 Teknik Sipil - Lintas Jalur  •  580 views


REDESIGN LEMAH IRENG (UNGARAN BAWEN ) BRIDGE, SEMARANG RESIDENCE WITH CABLE STAYED SINGLE PLANE SYSTEM
S1 Teknik Sipil - Lintas Jalur  •  1133 views


PERENCANAAN ULANG JEMBATAN LEMAH IRENG ( UNGARAN – BAWEN ), KABUPATEN SEMARANG DENGAN SISTEM CABLE STAYED SINGLE PLANE
S1 Teknik Sipil - Lintas Jalur  •  605 views


TRANSPORT PLANNING BUS CORRIDOR SURABAYA - SIDOARJO (THROUGH ROAD Ahmad Yani)
S1 Teknik Sipil - Lintas Jalur  •  649 views



! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.158.31.120
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan