EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Master Theses » Manajemen Industri-S2 MMT
Posted by yeni at 28/12/2006 10:29:01  •  22957 Views


GASKET PRODUCTION PLANNING BY LINIER PROGRAMMING METHOD AT PT. MCI PRIMA GASKET SURABAYA

Author :
Luhwulan, Anis  




ABSTRAK

Perencanaan produksi memegang peranan penting dalam industri. Hal ini akan menghindari kelebihan atau kekurangan dalam memenuhi permintaan yang ada kelebihan atau kekurangan jumlah inventori sehingga tidak menyebabkan pemborosan dalam hal biaya. Perencanaan produksi ini harus memperhatikan beberapa kendala-kendala yang ada untuk mecapai tujuan tertentu. Pada penelitian ini metode yang digunakan adalah linier programming dimana digunakan software Quantitative System untuk membantu menyelesaikan permasalahan tersebut. Perencanaan produksi dibatasi lima kendala yakni kendala permintaan kendala proses kendala mesin kendala inventori dan kendala bahan baku dimana fungsi tujuannya adalah untuk memimalkan biaya yang terdiri dari biaya produksi biaya kekurangan demand biaya kekurangan dan kelebihan inventori. Hasil dari penelitian ini diperoleh jumlah produk yang dibuat pada suatu periode dengan memanfaatkan tenaga kerja reguler dan lembur dimana tenaga kerja lembur dibagi menjadi lembur 1 dan lembur 2 dan jumlah produk dihasilkan untuk memenuhi permintaan periode saat ini dan permintaan periode selanjutnya sehingga dapat mencapai biaya yang paling optimal atau minimal.


ABSTRACT

Production planning plays an important role in industry because it will avoid the lack or excess in fulfilling demand from customer inventory so that the excess in spending cost will not be occurred. Production planning must consider some constraints to gain certain objective. In this research production planning uses linier programming method where quantitative system software is used to help the problem solving. Production planning is limited by five constraints such as demand process machine inventory and raw material where the objective function is to minimize cost that consists of production cost lack of demand cost lack of inventory cost and excess of inventory cost. This research results in not only number of units produced in certain period by reguler and overtime labour where the overtime labour is devided into overtime labour 1 and overtime labour 2 but also number of units produced to fulfill demand at the time of period and in the next period in order to obtain optimal or minimal cost.



KeywordsGasket; Perencanaan; Produksi; Metode Linier Programming.
 
Subject:  Perencanaan
Contributor
  1. Dr. Ir. Abdullah Shahab, MSc
Date Create: 28/12/2006
Type: Text
Format: pdf; 75 pages
Language: Indonesian
Identifier: ITS-Master-3100003018142
Collection ID: 3100003018142
Call Number: 519.72 Luh p


Source
Theses Industry Management RTMT 519.72 Luh p, 2002

Coverage
ITS Community

Rights
Copyright @2002 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-Master-3100003018142-360.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 10.199.6.2
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2021 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan