EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Master Theses » Manajemen Proyek & Konstruksi S2
Posted by budi at 23/12/2006 17:42:49  •  9122 Views


Investment Analysis Of Nusa Penida Cross Harbour Development

Author :
I NENGAH SUBAGIA 




ABSTRAK

Nusa Penida adalah satu satunya Kecamatan di Kabupaten Klungkung yang terletak di laut dan mempunyai luas 23 dari luas Kabupaten Klungkung. Untuk membuka wilayah Kecamatan Nusa Penida Pemda Klungkung merencanakan membuat dennagapelabuhan di Nusa Penida dan Klungkung Daratan. Keinudian tahun 2000 Pemerintah Kabupaten Klungkung bersama Lembaga Penelitian ITB mengadakan studi untuk kedua rencana dennagapelabuhan tersebut. Studi yang dilakukan berdasarkan ekonomi makro dan studi itu mengliasilkan bahwa pembangunan ke dua dermagapelabuhan tersebut layak dengan nilai investasi Rp. 24000000000. untuk di Klungkung Daratan dan Rp. 25000000000 untuk di Nusa Penida. Untuk ukuran Pemerintah Kabupaten Klungkung jumlah dana tersebut cukup besar namun pembangunan dermagapelabuhan tersebut nampaknya mutlak untuk direalisasikan untuk itu peneliti mencoba mengkaji pembangunan dermagapelabuhan tersebut secara anlisa investasi dengan tujuan agar ada gambaran bagi pihak lain terutama pihak swasta atau investor. Analisa investasi hanya untuk satu pelabuhan yaitu pembangunan Pelabuhan Nusa Penida. Pelabuhan Nusa Penida akan dipasangkan dengan Pelabuhan Benoa melayani penumpang dari baratSanur dan dengan Pelabuhan Padang Bai penumpang dari timur termasuk Klungkung. Dengan memberlakukan tarif pelabuhan berdasarkan peraturan pemerintah dan kondisi setempat Pelabuhan Padang Bai nasi I yang didapat adalah NPV - Rp 12096632386 0 dan tidak layak. Kemudian untuk memberikan gambaran lebih lanjut agar proyek bisa dilaksanakan peneliti mecoba memberikan solusi yaitu pertama dengan menaikkan tarif jasa kepelabuhan dan yang kedua subsidi dari Pemda Klungkung. Berkaitan dengan kenaikkan tarif peneliti menggunakan analisa scnsitifitas dengan secara bertahap menaikkan tarif yaitu mulai 50 100 150 dan 200 serta kenaikkan 200 mengliasilkan IRR 20.87 selanjutnya dianggap nilai IRR tersebut cukup aman mengingat investasi selama 30 tahun lama. Kemudian yang berkaitan dengan subsidi Peinda Klungkung harus mengeluarkan total dana sebesar Rp. 13099933130 yang eqivalen dengan nilai sekarang 2003 sebesar Rp. 7092067960 sebagai subsidi.


ABSTRACT

Nusa Penida constitute distric in Klungkung regency that the wide two-third of Klungkung regency. As a token the openning of the Nusa Penidas district government of Klungkung regency planning to develop harbour in Nusa Penida and Klungkung upland. Then in 2000 Government of Klungkung Regency cooperation with Research Institution of ITB have been conducted to study concerning that matter. Studying that conducted base on macro economic and the study find out that both harbour development were feasible with value of investment Rp 24000000000 for Klungkung upland and Rp. 25000000000 for Nusa Penida. For the Government of Klungkung regency the amount of cost large enough but the development should to realizable. Concerning with that matter researcher was trying to study the harbour development in investment analysis. The purpose of the analysis that is to give description to investor. Investment analysis for only Nusa Penida Harbour development. Nusa Penida Harbour will be setted by Benoa Harbour to service passenger from westSanur and by Padang Bai Harbour to service passenger from east included Klungkung. In according with going harbour tariff in Government law and condition at Padang Bai Harbour find out that NPV -Rp 12096632386 0 and no feasible. Then to give further description so that the project can be performed researcher trying to give solution that is first with increase harbour service tariff and two subsidy from Government of Klungkung Regency. Concerning with the increasing of tariff researcher used sensitivity analysis with in sequencing to increas tariff that is start from 50 100 150 and 200. The latest increase 200 find out IRR 20.87. The value of IRR 20.87 assumed save enough remember investment for 30 years. Then concerning with subsidy government of Klungkung regency must expend Rp. 13099933130 equivalen with present value 2003 Rp 7092067960 as subsidy.



KeywordsInvestasi;; Pelabuhan;Investment; harbour
 
Subject:  Dermaga
Contributor
  1. Ir. Rianto, B.A.,MSc, PhD
    Dr. Ir. I G.A. Adnyana Putera, DEA.
Date Create: 23/12/2006
Type: Text
Format: pdf; 71 pages
Language: Indonesian
Identifier: ITS-Master-3100003018397
Collection ID: 3100003019222
Call Number: 332.6 Sub a


Source
Theses Project Management RTS 332.6 Sub a,2003

Coverage
ITS community only

Rights
Copyright @2003 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-Master-3100003019222-203.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 10.199.6.2
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2021 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan