EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Undergraduate Theses » Teknik Sipil Ekstensi S1
Posted by davi at 08/12/2009 15:01:42  •  6585 Views


MODIFICATION OF KALI BAREK BRIDGE ON MALANG REGENCY BY STEEL FRAME SYSTEM

Author :
Mukson, Annas 




ABSTRAK

Jembatan Kali Barek berada di Jalan Lintas Selatan Propinsi Jawa Timur di wilayah Kabupaten Malang.Dengan lebar untuk 2 dua lajur kendaraan. Jembatan Kali Barek ini dibangun sebagai salah satu bangunan pelengkap pada proyek jalan Lintas Selatan JawaTimur. Struktur utama berupa gelagar-gelagar dari beton pratekan dan beton bertulang sepanjang 120 m yang terdiri dari 3 bentang dengan panjang masing-masing 40 m ditopang diatas 2 pilar dan 2 kepala jembatan. Selanjutnya pada Tugas Akhir ini akan dimodifikasi dengan menggunakan sistem rangka baja dan bentang diubah menjadi 40 m dan 80 m. Untuk bentang 40 m menggunakan sistem rangka baja terbuka sedangkan untuk bentang 80 m menggunakan sistem rangka baja tertutup berbentuk busur. Secara umum perencanaan jembatan ini menggunakan Bridge Management System BMS 1992 sebagai acuan pembebanan. Pembebanan yang diterapkan mengacu kepada beban - beban beban perpindahan dan pengaruh lainnya yang timbul pada suatu jembatan berdasarkan peraturan yang ada dalam Bridge Management System BMS 1992 . Pendimensian balok pada jembatan ini didesain terlebih dahulu kemudian menganalisa tegangan tegangan yang terjadi terhadap berat sendiri beban mati tambahan dan beban hidup selanjutnya melakukan kontrol. Secara umum perencanaan pendimensian dan kontrol menggunakan metode LRFD.


ABSTRACT

Kali Barek Bridge located in South Cross Street East Java Province on Malang Regency area. With width for two line of vehicles. This Kali Barek Bridge was build as one of complement structure at East Java South Cross Street project. Main structure are girder from precast concrete and steel concrete as far 120 m that consist of 3 spans with each length of 40 m supported on top of 2 pillar and 2 abutment. Next in this final project will modified with using steel frame system and change span in to 40 m and 80 m for spans 40 m using steel open frame system and for spans 80 m by steel close frame system and have shape of arch. Commonly the designed of this bridge using Bridge Management System BMS 1992 as load reference. The load that used refers to load moving load and other influences That comes at bridge be based on the rule that state in the Bridge Management System BMS 1992. The beam dimension in this bridge are designed firstly and then analyst the tensions that happened on own weight dead load added and live load next is doing control on it. Commonly the designed of dimensioning and controlling using LRFD method.



KeywordsJembatan; Struktur Rangka Utama; Baja; Bridge; Main Frame Structure; Steel
 
Subject:  Jembatan
Contributor
  1. Djoko Irawan Ir. MS
Date Create: 08/12/2009
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-Undergraduate-3100007028477
Collection ID: 3100007028477
Call Number: RSS 624.2 Muk m


Source
Undergraduate Thesis, Civil Engineering Department, RSS 624.2 Muk m, 2007

Coverage
ITS Community Only

Rights
Copyright @2007 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-Undergraduate-3100007028477-5844.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 10.199.6.2
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2021 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan