EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Undergraduate Theses » Teknik Elektro - Ekstensi
Posted by ida at 29/08/2008 15:37:45  •  8959 Views


THE ANALYSIS OF STEAM POWER PLANT TELUK NAGA 3X300 MW DEVELOPMENT FOR SUPPLYING ELECTRICAL POWER SYSTEM LOAD IN TO JAMALI INTERCONNECTION SYSTEM

Author :
M. Yusuf Perdana H 




ABSTRAK

Kebutuhan energi listrik pada era teknologi sekarang ini merupakan kebutuhan yang sangat penting di seluruh negara-negara di dunia termasuk Indonesia. Dengan semakin berkembang dan bertumbuhnya perekonomian Indonesia terutama daerah Banten dan Jakarta tentunya secara otomatis berpengaruh terhadap dituntutnya perkembangan dan pertumbuhan sektor ketenagalistrikan di Banten dan Jakarta yang semakin baik. Beban puncak merupakan salah satu ukuran besarnya konsumsi energi listrik dimana kebutuhan energi listrik yang terus bertambah menyebabkan perlunya pengembangan sistem ketenagalistrikan yang ada. Oleh sebab itu diperlukan pembangunan suatu pembangkit baru dalam hal ini PLTU sehingga kebutuhan energi listrik khususnya di Banten dan Jakarta dapat terpenuhi dengan baik.


ABSTRACT

Recently electrical power become a prime need in all countries in the world including Indonesia. Indonesian economical growth particularly in Banten and Jakarta needs a better growth in power electrical sector in Banten and Jakarta. Peak load is one of mesurement to determine power electrical consumption where the raise of electrical power need cause the need of developtment in power electrical system. There for it needs a new generator development in this case Steam Power Plant so power electrical need particularly in Banten and Jakarta can be fullfil.



KeywordsKebutuhan Energi Listrik, Beban Puncak, PLTU
 
Subject:  Tenaga matahari
Contributor
  1. Ir. Syariffuddin Mahmudsyah, M. Eng
    Ir. H. M. Djoko Santoso
Date Create: 29/08/2008
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-Undergraduate-3100007030299
Collection ID: 3100007030299
Call Number: RSE 333.793 2 Myu a


Source
Undergraduate Theses, DEPARTMENT OF ELECTRICAL ENGEENERING Faculty of Industrial Technology, RSE 333.793 2 Myu a

Coverage
ITS Community Only

Rights
Copyright @2007 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-Undergraduate-3100007030299-2015.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 10.199.6.2
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2021 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan